2025-08-28
Sprint 2025-08-28 Retrospective (2025-10-01)
Chair |
Timekeeper |
Note Taker |
---|---|---|
TW |
KB |
IG |
Items from previous Retrospective
NDW1926 Linux build?
ACTION: FA To check with CMS how to adopt Windows 10 LTS for build server.
Items from this retrospective:
Review of First Line Support
Discussion were had around the adoption of the first line support procedure.
GR identified that there was a problem where some issues were not picked up and missed from being actioned.
GR suggested a formal handover at the end of a week, perhaps write up a Friday summary of the week.
GR mentioned that Top Desk is the corporate platform and maybe we should look at using it.
FA Mentioned
Jira
, but it’s not free and we would need to look at licensing.FA suggests adopting a system where we can enter issues and close them out.
ACTION: FA to consider options in conversation with team members.
Developer Manual - protection of master branch
There was a bit of a debate in comparison between the ease of updating the manual versus the ideology that documentation should be at the same quality as code.
It was decided that instead of committing directly to master, we should have a trial period of creating PRs and flash-reviews. This policy should be reviewed at a later date to consider its efficacy.
Documentation on wiki instrument-information–hotfixes
JH raised the question as to whether we need to our hotfix/deploy process and suggests that we should either keep the hotfixes page up to date or remove it.
FA suggests creating a flash review or ticket.
Remove the Hotfix column.
Deploy scripts to not prompt to add text to the hotfix column.
Wiki instrument information pages are significantly out of date
GR asked whether we should make an effort to improve them, as having a page is useful for instrument support?
TW posed the question as to whether we should use the existing pages as a starting point or bin them and start again?
ACTION: TW to place a warning at the top of every page stating that the current information is historical content and may not be up to date.
Disc space
TW stated that small discs on various machines has caused repeated issues.
ACTION: GR to set up a group meeting with CMS to discuss.
Weird permissions on stage-deleted
Could we modify permissions of the stage-deleted folder or perhaps don’t use it?
Issue bumped until CMS is available to discuss.
Timings of deploys
GR commented that deployments being scheduled only a couple of weeks before cycle and during Summer holidays can be problematic, the Summer being of particular issue.
We should attempt to deploy a week earlier and deliver demos earlier.
Deploy script refinement
TW pointed out that occasionally a manual step in the deployment process does not get done, but there is no check that it actually has been done.
The Road-map should incorporate procedures to address this.
Renaming of ‘server-common’
JH suggested that we should rename ‘server-common’ to ‘ibex-ca-helpers’.
FA suggested ‘ibex-epics-helpers’
ACTION: JH to find some suitable names
Galil-old branch
FA suggested that a repo check on galil-old would be a good idea.
ACTION: FA to create a ticket to create a repo check on galil-old.